Project's EIS documents
Supplementary Technical Reports
- Review of Boggomoss Snail Populations (
1.04 MB) - Potential Groundwater Impacts Report 12 November 2014 (
43 KB) - Nathan Dam Boggomoss Springs Drilling Program Observations and Comments 2 November 2012 (
58 KB) - Nathan Dam Boggomoss Springs Drilling Program Observations and Comments 13 November 2012 (
112 KB)
Additional Information to the EIS (AEIS) - Chapters
- Part A – Introduction to the Additional information to the EIS (
601 KB) - Part B – Chapter 01 – Introduction (
386 KB) - Part B – Chapter 02 – Description of Project (
235 KB) - Part B – Chapter 03 – Climate and Natural Disasters (
162 KB) - Part B – Chapter 04 – Topography / Geomorphology (
155 KB) - Part B – Chapter 05 – Landscape character and Visual Amenity (
149 KB) - Part B – Chapter 06 – Geology and Soils (
249 KB) - Part B – Chapter 07 – Land use and Infrastructure (
5 MB) - Part B – Chapter 08 – Land Contamination (
158 KB) - Part B – Chapter 09 – Sensitive Environmental Areas (
223 KB) - Part B – Chapter 10 – Terrestrial Flora (
258 KB) - Part B – Chapter 11 – Terrestrial Fauna (
227 KB) - Part B – Chapter 12 – Aquatic Flora (
187 KB) - Part B – Chapter 13 – Aquatic Fauna (
428 KB) - Part B – Chapter 14 – Surface Water (
5 MB) - Part B – Chapter 15 – Groundwater (
307 KB) - Part B – Chapter 16 – Surface Water Quality (
5.5 MB) - Part B – Chapter 17 – Air Quality (
167 KB) - Part B – Chapter 18 – Greenhouse Gas Emissions (
195 KB) - Part B – Chapter 19 – Noise and Vibration (
307 KB) - Part B – Chapter 20 – Waste (
275 KB) - Part B – Chapter 21 – Traffic and Transport (
335 KB) - Part B – Chapter 22 – Indigenous Cultural Heritage (
205 KB) - Part B – Chapter 23 – Non-Indigenous Cultural Heritage (
265 KB) - Part B – Chapter 24 – Social Values and Management of Impacts (
177 KB) - Part B – Chapter 25 – Economic Environment and Management of Impacts (
425 KB) - Part B – Chapter 26 – Hazard and Risk (
167 KB) - Part B – Chapter 27 – Cumulative Impacts (
260 KB) - Part B – Chapter 28 – Matters of National Environmental Significance (
13.7 MB) - Part B – Chapter 29 – Environmental Management Plan (
297 KB) - Part B – Chapter 30 – Conclusions and Recommendations (
169 KB) - Part C – Refinement to the project description (
2 MB) - References (
265 KB)
Additional Information to the EIS - Appendices
- Appendix A1-A – EIS Display Consultation Report (
3.8 MB) - Appendix A1-B – AEIS Consultation Report (
6.1 MB) - Appendix A2-A – Submissions Register (
979 KB) - Appendix A2-B – Editorial Corrections (
197 KB) - Appendix B1-A – Updated Table of Approvals (
198 KB) - Appendix B1-B – Approach to provision of Environmental Offsets (
5.5 MB) - Appendix B2 – Updated Appendix 2B – Property descriptions of impacteds lots - pipeline route (
213 KB) - Appendix B6 – Soil Management Protocol (
704 KB) - Appendix B9 – Nathan Dam and Pipelines SEIS wetland survey (
4.1 MB) - Appendix B14 – Proposed Compensation Strategy and Options for Downstream Waterharvesters (
95 KB) - Appendix B15 – Part 1 Supplementary Groundwater Technical Report (
3.4 MB) - Appendix B15 – Part 2 Supplementary Groundwater Technical Report (
40.8 MB) - Appendix B16-A – Water quality monitoring results from Dawson River baseline surveys (
584 KB) - Appendix B16-B – Long term water quality monitoring at Taroom and Woodleigh (
124 KB) - Appendix B28-A – EcoSM 2013: Results of surveys for the Boggomoss Snail (
5.3 MB) - Appendix B28-B – AMEC 2013: Targeted surveys for the Boggomoss Snail (Adclarkia dawsonensis) (
4.4 MB) - Appendix B29 – Draft Environmental Management Plan (
331 KB)
EIS – Chapters
- Executive Summary (
1.6 MB) - Table of contents (
217 KB) - Chapter 01 – Introduction (
3.0 MB) - Chapter 02 – Description of Project (
8.7 MB) - Chapter 03 – Climate and Natural Disasters (
1.4 MB) - Chapter 04 – Topography and Geomorphology (
1.8 MB) - Chapter 05 – Landscape character and Visual Amenity (
3.6 MB) - Chapter 06 – Geology and Soils (
7.4 MB) - Chapter 07 – Land use and Infrastructure (
13.5 MB) - Chapter 08 – Land Contamination (
1.0 MB) - Chapter 09 – Sensitive Environmental Areas (
2.3 MB) - Chapter 10 – Terrestrial Flora (
7.5 MB) - Chapter 11 – Terrestrial Fauna (
3.4 MB) - Chapter 12 – Aquatic Flora (
1.1 MB) - Chapter 13 – Aquatic Fauna (
2.9 MB) - Chapter 14 – Surface Water (
5.2 MB) - Chapter 15 – Groundwater (
2.7 MB) - Chapter 16 – Surface Water Quality (
1.1 MB) - Chapter 17 – Air Quality (
2.7 MB) - Chapter 18 – Greenhouse Gas Emissions (
107 KB) - Chapter 19 – Noise and Vibration (
2.9 MB) - Chapter 20 – Waste (
160 KB) - Chapter 21 – Transport (
3.5 MB) - Chapter 22 – Indigenous Cultural Heritage (
193 KB) - Chapter 23 – Non-Indigenous Cultural Heritage (
720 KB) - Chapter 24 – Social Values and Management of Impacts (
4.7 MB) - Chapter 25 – Economic Environment and Management of Impacts (
1.1 MB) - Chapter 26 – Hazard and Risk (
363 KB) - Chapter 27 – Cumulative Impacts (
4.5 MB) - Chapter 28 – Matters of National Environmental Significance (
11.2 MB) - Chapter 29 – Environmental Management Plan (
516 KB) - Chapter 30 – Conclusions and Recommendations (
45 KB) - Chapter 31 - References (
271 KB) - Glossary of terms (
152 KB) - Abbreviations (
132 KB)
EIS - Appendices
- Appendix 1A-1 – Terms of reference (
972 KB) - Appendix 1A-2 – Terms of reference Cross-Reference Table (
319 KB) - Appendix 1B – Consequence Tables (
30 KB) - Appendix 1C – Consultation Report (
16.3 MB) - Appendix 1D – Development Approvals (
130 KB) - Appendix 1E – Study Team (
73 KB) - Appendix 2A – Affected Properties Table – Dam (
65 KB) - Appendix 2B – Affected Properties Table - Pipeline (
59 KB) - Appendix 2C – Affected Properties Table – Associated Infrastructure (
34 KB) - Appendix 6A – Additional Soils Information (
543 KB) - Appendix 8A – Potentially Contaminated Sites Within and Outside FSL (
1.9 MB) - Appendix 8B – Potentially Contaminated Sites Within and Adjacent to Pipeline Route (
1.0 MB) - Appendix 10A – Regional Ecosystems within Proposed Pipeline Alignment Mapped at Scale 1:10000 (
15.0 MB) - Appendix 10B – Terrestrial Flora Supporting Information (
15.5 MB) - Appendix 10C – Bioregional Extent and Representation of Significant REs in Protected Areas (
59 KB) - Appendix 11A – Detailed Fauna Methodology and Results (
449 KB) - Appendix 11B – Results of Boggomoss Snail Survey (
2.5 MB) - Appendix 11C – Survey for the Boggomoss Snail – September (
6.4 MB) - Appendix 11D – Survey for the Boggomoss Snail – July 2010 (
7.8 MB) - Appendix 11E – The Critically Endangered Boggomoss Snail – Relocation of Mt Rose Populations (
803 KB) - Appendix 12A – Aquatic Flora and Fauna Dry Season Field Survey – November 2007 (
16.4 MB) - Appendix 12B – Pre-Wet Season Field Survey – Turtles and Water Quality (
203 KB) - Appendix 12C – Post-Wet Season Field Survey – Aquatic Flora and Fauna Component (
2.3 MB) - Appendix 12D – Pipeline Flora and Fauna – Existing Environment (
7.7 MB) - Appendix 13A – Ecology of the Fish that may be affected by Nathan Dam (
328 KB) - Appendix 13B – Fitzroy River Turtle Distribution-Reproductive Condition and Nesting Survey – 2010 (
1.6 MB) - Appendix 13C – Fitzroy River Turtle Survey (
6.9 MB) - Appendix 14A – Climate Change Modelling Inputs (
86 KB) - Appendix 15A – Interpreted Extent and Thickness of the Major Formations at the Dam and Surrounds (
3.2 MB) - Appendix 15B – Summary of Details for Water Bores Registered with DNRM for Region around Nathan Dam (
85 KB) - Appendix 15C – Groundwater Level Data from DERM Database (
42 MB) - Appendix 15D – Summary of Groundwater Authorisations from the DERM Water Entitlements System (
46 KB) - Appendix 15E – Nathan Dam Groundwater Model Development (
1.8 MB) - Appendix 15F – Impact of Dam Construction and Operation on Boggomoss Springs (
27 KB) - Appendix 15G – Impact of Dam Construction and Operation on Existing Groundwater Users (
72 KB) - Appendix 15H – Modelled changes to Groundwater Elevations (
37.7 MB) - Appendix 16A – Summary tables of Water Quality Results Collected at DNRW Monitoring Sites (
172 KB) - Appendix 16B – Summary tables of Water Quality Results for SunWater Monitoring Program of Glebe Weir (
106 KB) - Appendix 23A – Historic Heritage Management Plan (
6.2 MB) - Appendix 30A – Proponent commitments (
32 KB)
Last updated: 16 Mar 2023